Section 01
Project Overview
This project required integrated MEP and life-safety design for a commercial kitchen environment, with deliverables sequenced to match phased execution.
Commercial kitchen environments present unique engineering challenges, requiring careful coordination between ventilation systems, fire protection systems, plumbing, and gas line design. The project was structured in three phases to align with the client's construction schedule.



